Radha Krishna Temple Construction

     Click button  below to

     or click to HVAC Spec Subpage to read

     Click button  below to

     or read & review below 


Radha Krishna Temple Kitchen Expansion Project

Waheed Consulting


SECTION 15010 - GENERAL REQUIREMENTS FOR MECHANICAL SYSTEMS

 PART 1 - GENERAL

1.5 SUBMITTALS

 A.   Comply with pertinent provisions of Section 01340.

 

B.  Product Data: Submit the following:

 

1. Materials list of items proposed to be provided under Division 15.

2. Manufacturer's specifications and other data needed to prove compliance with the specified requirements. The term "Compliance" is understood to mean that the Contractor certifies that the submitted equipment will meet or exceed the contract document requirements. Items that do not clearly meet this definition should be identified and explained as required in the following paragraph.

3. Identify the difference between the specified item or function and the proposed.

 
4. Explain with enough detail so that the Engineer/Owner can easily determine that the item complies with the functional intent. List any disadvantages or 
advantages of the proposed item versus the specified item. Submit technical data sheets and/or pictures and diagrams to support and clarify. Organize in a clear and concise format. All substitutions shall be approved in writing by Architect. The Architect’s decision shall be final.

5.  Allow a minimum of three (3) working days for the review of submittals and each  re-submittal.


6.   Compliance with the Contract documents shall be the sole responsibility of the Contractor. Items on equipment that are were not accepted by the Architect in writing as an approved equal shall be replaced or revised to comply with the contract documents at the Contractor's expense.

 
7.  Manufacturer's recommended installation procedures which, when reviewed by the Architect, shall become the basis for accepting or rejecting actual installation procedures used on the work.

 
8.  Sign the submittal as an indication of compliance with the contract documents. Any deviations from the contract documents, shall be indicated on the submittal prior to signing. Any deviations not indicated shall be cause for rejection and removal of the non-complying equipment at the Contractor’s expense.


C.  Submittals required of materials and equipment under this section include the following:


1. Piping and Accessories Materials:

Clearly marked up manufacturer's data showing compliance with the specifications for:

a) Piping material proposed for each system.

b) Valves, cocks, and specialties.

c) Test and measuring devices.

d) Flexible connectors for piping.

e) Flanges.

f)  l/8" scale (minimum) sanitary sewer, domestic hot and cold water, storm, and refrigerant piping shop drawings showing coordinated piping routing and arrangements with all equipment, accessories and system expansion and contraction compensation methods.

2. Vibration Isolation and Sound Control Materials:

a..  Submit shop drawings showing the structural design and details of inertia bases, steel beam bases, and other custom-fabricated work not covered by manufacturer's submitted data.

b.  Furnish layouts of templates to be furnished to fabricators of equipment bases, foundations, and other support systems, as needed for coordination of vibration isolation units with other work.


c.  Submit shop drawings indicating the scope of vibration isolation work, locations of units and flexible connections. Include support isolation points for piping, air handling units, inertia bases, etc.

d.  Include schedule of isolation units, showing size or manufacturer's part number, the weight supported and resulting deflection of each unit.

e.  For spring isolation units, show wire size, spring diameter, free height, solid-compression height, operating height, fatigue characteristics and ratio of horizontal to vertical stiffness.

f.  For spring-and-pad type isolation units, show the basis of spring rate selection for the range of loading weights.


3. Mechanical Identification Materials:

Clearly marked-up product literature or samples showing compliance with specified materials for:

 1) Valve tagging.

 2) Pipe marking.

 3) Equipment marking.

4. Insulation:


5. Pumps:


a) Manufacturer's certified data on thermal performance.

 

b)  Details, when required, of methods to be used in providing for unusual piping expansion and contraction.

 
c) Manufacturer's product data and application information on heat tracing system including all electrical requirements.

 
d) Manufacturer's data on any alternate insulation material of reduced thickness, including pre-insulated pipe.


e) Manufacturer's data on all jacketing materials, sealants and fasteners.

 
f) Provide factory certified performance curve clearly marked with the operating point of each pump.



g) Provide manufacturer's data on all panels, accessories, and specified factory options.


h)Provide all electrical characteristics.


6. Fire Protection System:

a) Provide hydraulic calculations for all areas.

b) Provide l/8" scale piping shop drawings showing coordinated piping routing and arrangements with all accessories.


c) Provide clearly marked-up manufacturer's data showing compliance with the specifications for:

 d)  All required system valves and switches.

 e) Sprinkler heads for all areas and sprinkler cabinet.


f) Fire pump (if used) with jockey pump and controller.

 g) Fire hoses, hose valves and cabinets.

h) Fire department connection.

Submit hydraulic calculations and drawings Construction Manager for approvals. 


 7. Plumbing Materials:

Clearly marked-up manufacturer's data showing compliance with the specifications on:

1) Fixtures, carriers and all accessories.

2) Plumbing equipment.

3) Water hammer arresters.

4) Backflow preventers.

 5) Trap primers

6) Tempering valves.

 7) Water heaters (see Heating below).


8. Heating:

a.   Provide clearly marked-up manufacturer's data showing compliance with scheduled values and specifications for:

 1) Hot water heaters.

 2) Unit heaters.

 Provide all electrical characteristics.


9. Refrigeration:

a) Provide clearly marked-up manufacturer's data showing compliance with scheduled values and specifications for:

 

b) D-X condensing units.

 
c) Ground mounted Rooftop units.

 

d) Through-the-wall air conditioning units.

 

e) Provide all electrical characteristics.


 
10. Air Handling:
Provide clearly marked-up manufacturer's data showing compliance with scheduled values and specifications for:

1) Fan coil units.

2) Ventilation fans.

3) Filters.

4) Intake/relief hoods.

5) Wall louvers.

Provide all electrical characteristics.


11. Air Distribution Materials:

Provide clearly marked-up manufacturer's data showing compliance with scheduled values and specifications for:

1) Air devices.

2) 1/4" scale ductwork shop drawings for all systems showing equipment locations, detailed data such as bottom of duct elevations, airstream sizes, all duct accessories, and duct construction details showing compliance with SMACNA requirements for the specified duct pressure of each system.

3) Fire dampers, fire and smoke dampers.

4) Air terminals.


12. Controls and Instrumentation:


a. Provide detailed shop drawings showing all components, wiring, tubing, and accessories.

b. Provide comprehensive sequence of operation description of each control system.

c.  Provide clearly marked-up manufacturer's data showing compliance with the specifications for all products proposed.

d.  Provide all electrical characteristics of components.


 
13. Testing and Balancing:

List of instruments to be used with latest date of calibration test for each. Brief description of test and balance contractor experience.


14. Variable Frequency Drives/Speed Controllers (VFD):

Provide clearly marked-up manufacturer ’s data showing compliance with scheduled values and specifications.

Provide electrical characteristic.


15. Record Documents: Reference the requirements detailed in this section.

 

16. Operation and Maintenance Data: 
      

Provide owner with all operating manuals and warranty documentation at completion of work.  
 
17.   Resubmittals 


Resubmittals of rejected submittals shall be limited to one (1) in number.


Costs for processing subsequent resubmittals in excess of the first resubmittal, resulting from the Contractor's disregard of Architect/Engineer's primary submittal rejection comments, shall be borne by the Contractor.


Costs shall be based on Architect/Engineer's hourly rates as published in their current professional fee schedules and shall also include reimbursable costs for delivery, mailing, and photocopies at direct cost plus ten percent (10%).


 
1.6 SUBSTITUTIONS

The use of manufacturers' names and catalog numbers followed by the phrase "or equal" is generally used to establish a standard of quality and utility for the specified items and to provide a dimensional reference for construction documents that are drawn to scale.

 Submittals for "equal" items shall, where applicable, include the following data which are not necessarily required for specified items:

Quality


Durability

Performance characteristics.

 Materials.

Finish.

Warranty

Certification of conformance with specified codes and standards.

Manufacturer's specifications and other data needed to prove compliance with the specified requirements. The term "Compliance" is understood to mean that the Contractor certifies that the submitted equipment will meet or exceed the contract document requirements. Items that do not clearly meet this definition should be identified and explained as required in Paragraph 6 below.

 
Identify the difference between the specified item or function and the proposed. Explain with enough detail so that the Architect/ Engineer/Owner can easily determine that the item complies with the functional intent. List any disadvantages or advantages of the proposed item versus the specified item. Submit technical data sheets and/or pictures and diagrams to support and clarify. Include shop drawings for all piping and ductwork equipment per Paragraph 1.5 Submittals. Organize in a clear and concise format.


C.  Submittals of "equal" components or systems may be rejected if:

1.  The material or equipment would necessitate the alteration of any portion of the mechanical, electrical, architectural or structural design.

2.  Dimensions vary from the specified material or equipment in such a manner that accessibility or clearances are impaired or the work of other trades is adversely affected.

Proposed substitutions for materials or equipment must be noted in Contractor's proposal.  Substitutions later may be rejeted by owner without additional cost. 

No substitution shall be made unless authorized in writing by Construction Manager and/or the Architect. Should a substitution be accepted, and should the substitute material prove defective or otherwise unsatisfactory for the service intended, and within the guarantee period, the Contractor shall replace this material or equipment with material or equipment specified, at his own expense, and to the satisfaction of the Architect/Construction Mgr.

Contractors submitting bids on substitute materials and equipment must also provide a written performance guarantee certifying that the substitute materials and equipment will produce the specified effects and meet the approval of the Architect.


 

HVAC SPECS

SUBMITTALS & SUBSTITUTIONS